News

    Kjell Erik Drevdal

    kjell.erik.drevdal@flopetrol-wb.com

    +47 916 43 552

    Mr. Drevdal holds a Petroleum engineering degree from University of Stavanger and has more than 35 years of experience from the oil industry, related to drilling and well technology and operations: On-/offshore drilling engineering/supervisor positions with several major E&P co’s. Managerial positions with drilling contractor, equipment manufacturer, technology development company and technology/service provider.

    Recent Posts

    Success using QuartzPack® in Rig-less MIT

    Is this the time to P&A?

    There is a saying in the industry; “When the times are good, P&A can wait, and when the times are bad, P&A must wait.” Could we change this behaviour and keep the industry occupied with useful work?

    QuartzPack™ embraced by operators in Colorado, USA

    The most used material for well integrity is cement. The last couple of years this has slowly started to change. Experience has shown, that although cement maintains its compressional strength for hundreds of years, it may fail to provide a permanent pressure seal over time.

    Leave a comment below:

    About FloPetrol

    FloPetrol Well Barrier (WB) is a group of experienced and competent specialists that have seen the great value of the smart technology that has been developed by SandAband AS.

    We provide Well Integrity ABC:

    • SandAband for P&A
    • SandBlock for LCM
    • SandConstruct™ for BBC

    Learn more about FloPetrol Well Barrier

    Subscribe to news from FloPetrol

    Recommended for you: